Waste-to-energy plant burning digested sewage sludge - Drasty
EIC Activities
Project study for a waste-to-energy plant digested sewage sludge with a capacity of 98t DS/day.
Technical parameters
Amount of waste:
98 t DS/day
Capacity:
2x8 t/h (digested sludge), 2 x 0,354 - tun/h (screenings)
Net calorific value:
1,0 - 2.0 MJ/kg
Availability:
8760 h/year
Steam parameters:
40 bar/400°C
Energy production:
2 MW el
Furnace:
Fluidized bed
Flue gas cleaning:
SNCR - DENOX, electrostatic precipitator, wet scrubbing, DEDIOX catalytic fabric filter
No. of lines:
3 (2 operation + 1 cold reserve)