E.I.C., Ltd., Ecological and Industrial Consulting
 
 

Waste-to-energy plant burning digested sewage sludge - Drasty

EIC Activities

Project study for a waste-to-energy plant digested sewage sludge with a capacity of 98t DS/day.

Technical parameters
Amount of waste: 98 t DS/day
Capacity: 2x8 t/h (digested sludge), 2 x 0,354 - tun/h (screenings)
Net calorific value: 1,0 - 2.0 MJ/kg
Availability: 8760 h/year
Steam parameters: 40 bar/400°C
Energy production: 2 MW el
Furnace: Fluidized bed
Flue gas cleaning: SNCR - DENOX, electrostatic precipitator, wet scrubbing, DEDIOX catalytic fabric filter
No. of lines: 3 (2 operation + 1 cold reserve)